tasks with cc_nonideal are costing me credit

Message boards : Number crunching : tasks with cc_nonideal are costing me credit

To post messages, you must log in.

AuthorMessage
Profile Greg_BE
Avatar

Send message
Joined: 30 May 06
Posts: 5691
Credit: 5,859,226
RAC: 0
Message 58043 - Posted: 19 Dec 2008, 19:56:47 UTC

I have run 2 of these tasks at 4 hrs with a OC'd cpu and lots of memory and the such but am losing 15.03 credits on the first and 13.2 credits on the other.
a third one cost me 1 credit.

This is claimed vs granted with granted being lower.

Whats up with this nonsense? I thought we were done with losing credits for work done.

Any comments/ideas?
ID: 58043 · Rating: 0 · rate: Rate + / Rate - Report as offensive    Reply Quote

Message boards : Number crunching : tasks with cc_nonideal are costing me credit



©2024 University of Washington
https://www.bakerlab.org